PUBLIC INFRASTRUCTURE | |
1. | Construction of absorption / RC drains within the Township of Quatre Bornes |
2. | Fixing of LED floodlights on municipal football grounds |
3. | Supply and fixing of LED lanterns |
4. | Resurfacing of roads within the Township of Quatre Bornes |
5. | Construction of new roads within the Township of Quatre Bornes |
6. | Construction of RC covered pyre at Palma and Berthaud Crematorium |
7. | Patching works (stockpiles) by in-house labour |